I may not understand blueprints correctly, so please educate me!
I'm an instructional designer in higher ed. I'm working on a course with multiple sections that run on two different schedules. All content and requirements are the same - only the dates are different. I'm using a blueprint course to sync the content, but I don't want to sync the dates.
In the blueprint, I first associated the child courses that will run on Schedule A, with the corresponding dates. Then I disassociated those courses, changed the blueprint dates to Schedule B, and associated it with the Schedule B courses. Everything looked fine. Then the instructor made a couple of changes to the blueprint. I locked content only, leaving all the date options unchecked. But when I reassociated all the child courses to sync them, the blueprint dates (still set to Schedule B) pushed in and overwrote the dates in the Schedule A courses.
What did I do wrong? How can I do this better, so I can sync the content but not the dates?